      Flush with more than $850 million in unallocated Measure R Facilities Bond funding, the Pasadena Unified School District (PUSD) is weighing options for campus investments and consolidation.

      By Wesley Reutimann

      On Wednesday, February 25, the District’s new Superintendent Facilities Advisory Committee (SFAC) considered plans for the sole remaining public school site in west Pasadena, San Rafael Elementary School.

      Facilities staff presented three options for the historic campus:

      • Option A ($78 million) would modernize the century-old campus’s electrical, HVAC, bathrooms, and other core infrastructure, upgrade select outdoor facilities, and replace five portable bungalow classrooms with a permanent building.
      • Option B ($70 million) would modernize the basic infrastructure but would not replace the portable classrooms.
      • Option C ($116 million) would completely demolish and reconstruct the elementary campus.

      All three options include seismic upgrades.

      graph by PUSD

      Option A would include modernization of key infrastructure (e.g., utilities, restrooms, HVAC, ADA access) plus the replacement of (5) portable classrooms on the south side of campus with new construction (Photo – PUSD)

      graph by PUSD

      Option B would cover campus modernization plus the replacement of (5) portable classrooms on the south side of campus with new construction (Photo – PUSD)

      graph by PUSD

      Cost estimates for the (3) options presented by PUSD Facilities staff on Feb. 26, 2026 (Photo – PUSD)

      Adaptive Reuse

      The aging campus, nearly closed more than once in the past decade due to seismic concerns, reflects the difficult decisions PUSD faces across more than two dozen sites in Pasadena, Altadena, and Sierra Madre. Years of deferred maintenance, declining enrollment, seismic requirements, and ADA compliance must all be addressed. Yet at historic campuses like San Rafael Elementary, demolition should not be the default. Adaptive reuse, the thoughtful rehabilitation and modernization of existing buildings, offers economic, environmental, and community advantages.

      First, adaptive reuse is generally the most fiscally prudent path. While renovation costs can appear high upfront, demolition and new construction frequently exceed estimates due to site preparation, hazardous material abatement, and rising construction costs. Local labor shortages, particularly in the wake of the Eaton and Palisades fires, add further uncertainty. Once a campus is demolished, there is no partial rebuild if costs escalate. Taxpayers would absorb overruns, limiting PUSD’s ability to address needs elsewhere. Rehabilitation, by contrast, allows phased improvements and greater flexibility as costs become clear.

      Second, historic campuses often contain durable materials and craftsmanship that would be prohibitively expensive—if not impossible—to replicate today. Thick masonry walls, mature trees, and thoughtful layouts reflect an era when schools were designed as lasting civic investments. Modern upgrades—energy-efficient HVAC and lighting, accessibility improvements, updated restrooms—can be integrated while preserving that value.

      trees

      An aerial view of campus (Photo – David Rey)

      Third, adaptive reuse is the more environmentally responsible choice. Every existing school building embodies decades of energy, materials, and labor. Demolition discards that investment and replaces it with carbon-intensive new construction. The U.S. Environmental Protection Agency identifies construction and demolition debris as one of the largest waste streams in the country. Beyond landfill impacts, new construction generates substantial air and climate pollution through concrete production, steel manufacturing, and transportation. Retaining and upgrading existing structures significantly reduces those impacts. The greenest building is almost always the one that already exists.

      Fourth, adaptive reuse directs more funding toward skilled local labor rather than mass-produced materials. Investing bond dollars in local contractors, craftspeople, and suppliers helps circulate economic benefits within the community.

      Fifth, modernization requires less time. District staff estimate that Options A and B would take roughly one school year, while demolition and reconstruction would take two. A longer timeline would increase neighborhood disruption and require relocating students and staff to a swing space for twice as much time.

      Finally, adaptive reuse strengthens community identity. Historic schools anchor neighborhoods and connect generations. In Pasadena, these campuses reflect architectural traditions and civic history that cannot be recreated once lost. Their scale and character contribute to neighborhood cohesion and pride. This continuity is especially meaningful as communities recover from events like the devastating Eaton Fire. West Pasadena residents have rallied multiple times over the past two decades to keep San Rafael Elementary open.

      A sustainable path forward

      As PUSD considers how to invest nearly a billion dollars in bond funding — the SFAC Committee was divided on their preferred option for San Rafael — the District should embrace adaptive reuse as a sustainable path forward. This does not mean preserving buildings unchanged; it means upgrading them to meet modern standards while retaining their essential character.

      Seismic retrofits, improved heating and cooling, accessibility upgrades, solar power, and energy-efficient technology can all be incorporated into historic structures. These improvements would prepare PUSD campuses for the next century while honoring the original public investment. Local examples, from the renovation of Pasadena’s historic civic center to the transformation of the 1927 Flintridge/Biltmore Hotel into Flintridge Sacred Heart Academy, demonstrate the viability of adaptive reuse.

      PUSD schools have always been places of learning. Preserving and adapting historic campuses like San Rafael Elementary would ensure the District continues to model stewardship, resilience, and responsible public investment for generations to come. Adaptive reuse is the practical, sustainable, and forward-looking choice.

      Lifting Up and Informing Our Communities

      For over a decade, we’ve been more than just reporters, we've been your neighbors, your watchdogs, and your champions for truth.

      While national headlines come and go, we stay focused on what matters most: your street, your schools, your air, your community.

      We ask the tough questions. We hold power to account. And we do it with integrity, guided by facts, not spin.

      At Colorado Boulevard Newspaper, we believe in science, listen to experts, and put your interests above clickbait and corporate control.

      There are no shareholders here. No agendas. Just local journalism, powered by people who care.

      Because we live here too.

      If our work matters to you, help us keep going strong. A $5 gift or a subscription fuels real reporting that puts community first.

      Please explore the many ways you could support us by clicking the blue button below.

      Support

      Author

      Comments

      1. Tom Hogen-Esch says:

        Seems like a no-brainer to me Mr. Reutimann, and clearly going to cost less to do option A or B….Hard to imagine that they would choose to demo such an architectural gem